PLAN — COMPASS RICE Rebrand¶
Initiative: INIT-COMPASSRICE-001
Repository: github.com/ProductBuildersHQ/compass-rice
Predecessor: INIT-SPECTRRICE-001 (delivery_complete, shipped as v0.1.0 under the name
spectr-rice) — preserved as-is; this initiative does not rewrite that history.
Decisions¶
- D1 — Rename to COMPASS RICE. More executive-legible terminology: Serve → Customer, Toil → Supportability, Cost → Operational Efficiency, Expand → Market Expansion. Platform and Risk are unchanged — they were already the clearest names available.
- D2 — COMPASS is a brand name, not a strict letter-per-profile acronym at six profiles. C-O-M-P-A-S-S is seven letters; without a built Advantage/Acquisition profile the six current profiles' initials (C, O, M, P, S, R) don't spell anything, and forcing one would repeat the exact anti-pattern the framework rejects elsewhere (inventing a category to complete a word). Precedent: the ideation itself proposed this same decoupling for SPECTR ("SPECTR becomes a name... rather than forcing every formal profile to use its letter word forever").
- D3 — Advantage is rejected as a profile. Applying the existing two-part profile test (PRD
D7,
INIT-SPECTRRICE-001): does it need fundamentally different raw evidence and normalization rules? Advantage's proposed evidence (win/loss, competitive gaps, analyst research, Kano delighters) already lives inside Market Expansion (barrier-removal, win-rate improvement — verbatim overlap with Expand's existing Impact rubric) and Customer (retention/ satisfaction evidence). Its proposed Reach ("% of competitive opportunities") and Impact ("degree of differentiation on win rate") are structurally identical to Expand's, not a distinct normalization algorithm. It fails both halves of the test. - D4 — Acquisition is reserved, not built. A distinct candidate surfaced during review: growth/funnel efficiency (CAC, conversion rate, LTV:CAC, pricing experiments) — evidence from prospects who haven't purchased, in a market already addressable, which is a different population from Customer (existing buyers) and Expand (market access). This maps to the original PRD's already-reserved "Revenue Optimization" seventh-profile candidate — independent prior evidence this gap is real, not invented for the letter. It plausibly clears the profile test better than Advantage did, but the boundary against Operational Efficiency (is CAC reduction just "Cost applied to marketing spend"?) needs real scrutiny against an actual roadmap item before being built. Per the existing discipline: wait for a real initiative that demonstrably fails to fit the six, don't build speculatively.
- D5 — Historical documents are not rewritten.
docs/releases/v0.1.0.mdanddocs/specs/initiatives/INIT-SPECTRRICE-001/*describe what was true at v0.1.0's release (the project genuinely was namedspectr-ricethen) and stay as accurate history. Only their links are repaired where they'd otherwise 404 against the renamed repository. The rename is documented forward, as a new CHANGELOG entry and release notes — not by editing the past. - D6 — Profile package renames keep single-word slugs, matching the existing convention
(
serve,cost,expand,toilwere already single words):customer,operations,market,supportability.platformandriskare unchanged. ProfileID version stays atv1for renamed profiles — the normalization logic itself doesn't change, only the label, so this isn't the kind of change TRD T5 requires a version bump for.
Approach¶
Mechanical module/repo rename first (highest leverage — everything downstream depends on it),
verified by a full build/test/lint pass before touching profile-specific code. Then one RMI per
renamed profile (Customer, Operational Efficiency, Market Expansion, Supportability), each
touching: package directory, ProfileID constant, spectr.Profile canonical constant, rubric
file, golden tests, and every cross-package reference (examples/, gen/, cmd/spectr).
Platform and Risk need no structural change — only a terminology pass where docs describe them.
Documentation and schema regeneration land last, once every Go identifier is settled, so the
docs describe the final state rather than an intermediate one.
Working agreements¶
- Conventional commits; each RMI's commits carry
Refs: RMI-COMPASSRICE-NNNtrailers. - Build, vet, test, and lint after every RMI — this rename must never leave the tree broken at any commit boundary, same discipline as the original build.
- No git history rewriting:
INIT-SPECTRRICE-001's commits and RMI trailers stay as they are.