PLAN — Theory of Change Specification — Go-first model, JSON Schema, measurement, and leadership reporting

Initiative: INIT-THEORYOFCHANGESPEC-001 Repository: github.com/ProductBuildersHQ/impact-model Version: 0.4 Status: Draft — pending tech-lead review (pbhq-lite gate: after PLAN)

This PLAN is non-normative. It sequences the work in PRD.md and TRD.md and must not add requirements. Execution state lives in ROADMAP.md.

1. Approach

Thin slice first, then deepen. The first five phases build one complete path from end to end:

minimal model → validate → edit → pathways, metric library, provenance → diagram, logic models, metric definitions, glossary, workshop deck, draft from public sources → assessment, review packet and sheet, review import, approval

That path is the first adopter milestone: draft a theory from public information, share it as familiar documents, take the organization's responses back in, and approve the agreed baseline. Later phases add depth behind interfaces the slice has already proven.

Why this order:

  1. Model, schema, load, validate, edit. Every consumer binds to the model. Every mutation goes through one validated patch engine from day one.
  2. Pathways, metric library, glossary, and provenance are the smallest additions a real organization needs. Provenance has to arrive with the first draft, because the first draft is typically built from public sources and every element must say whether it was stated or inferred.
  3. Workshop pack and source drafting. Diagram, logic models, metric definitions, glossary, CSV, a Marp workshop deck, and the draft-from-sources skill. Together they turn public sources into a presentable hypothesis theory.
  4. Review and agreement. The assessment report, the pandoc sharing profile with export stamps, the review packet and review sheet, review import as proposals, and approval. This closes the loop with people who never touch the tools. The loop is file-based, so it works with manual upload and download before any Google automation exists.
  5. Measurement-framework design. Metric selection and burden, stories, and UNDG change analysis.
  6. Quality. Lint profiles, the rubric, and judging.
  7. Measurement.
  8. Reporting, story, and presentations.
  9. Agents and revisions. The MCP server, skills, theory diff, and Google sharing automation. Google sharing waits on gogoogle and mcp-google (INIT-GOGOOGLE-001, INIT-MCPGOOGLE-001).
  10. Ecosystem integration and release.

Major bets:

  • The ToC graph is primary.
  • ObservationSet is a separate document.
  • Shared metric definitions plus deterministic tools.
  • All edits go through validated patches.
  • Decks reuse the report view.
  • Judging is file-based.
  • Provenance lives on every element.
  • Review responses are a channel-neutral file (ReviewResponse) imported as proposals. Google Drive is one channel, reached through external tooling; this module stays free of cloud dependencies.

Deliberately deferred:

  • contribution claims
  • substantiated observed outcomes
  • logframe matrices
  • XLSX
  • data connectors and record linkage
  • a hosted service
  • native PPTX generation in Go

1.1 Adopter milestones

The phases are ordered so a first adopter can use the tools at each stage of a ToC-based impact-measurement engagement. The adopter is a small-staff organization.

Adopter milestone What happens Phases needed
M0 — Hypothesis draft Draft the ToC from public sources; render the workshop pack and assessment 1–4
M1 — Review, workshop, and agreement (thin slice) Share the review packet and sheet; workshop with live edits; import responses; approve v1.0 5
M1.5 — Collection plan Score candidate metrics; set burden budget; collection plan 6
M2 — First measurement cycle Load the first month's spreadsheet data; baseline status 8 (plus RMI 024)
M3 — Mid-point learning Learning review; audience stories; decks; rubric review of the revised ToC 7, 9
M4 — Handoff Staff run the routine through an AI assistant, including Google sharing 10

2. Affected Components

New repository; every component is new.

Component Change Notes
Repo scaffold (go.mod, CI, .golangci.yaml, CLAUDE.md, README.md, LICENSE) New Mirrors market-spec / prism conventions
pkg/impact, pkg/ref New Model (including provenance) and reference grammar
schema/, cmd/generate-schema New Go-first schema pipeline
pkg/impactio, pkg/validate, pkg/graph New Load, canonical format, check, analyze
pkg/edit, pkg/diff New Patch engine, element commands, theory diff
pkg/report, pkg/slides New Reports and Marp decks from one view model
pkg/share, pkg/review New Sharing exports and stamps; review import and approval
pkg/burden, pkg/tabular New Collection burden; CSV import / export
pkg/lint, pkg/judge, spec/ New Rules and profiles; judge bundles; template + rubrics
pkg/measure New Status computation
pkg/service, cmd/impact-model, pkg/mcp New Service layer; thin Cobra CLI and MCP adapters
skills/ New Agent skills over the CLI, including source drafting and Google sharing
pkg/prismx New prism-roadmap adapters
examples/, testdata/, docs/ New Fictional reference ToCs, defect corpus, concept mapping, integration contract
gogoogle, mcp-google Separate initiatives INIT-GOGOOGLE-001 (Drive upload / comments, suggestion-aware Docs), INIT-MCPGOOGLE-001 (MCP tools)
specification-workflow-spec Follow-up (separate repo) Sync toc template + rubrics as a spec type

3. Work Breakdown

Step P-NN corresponds to RMI-THEORYOFCHANGESPEC-0NN. Phases group steps by sequence, not by number.

Phase 1 — Core Model and Schema

Step Approach Satisfies Verification Depends on
P-01 Scaffold module, CI, lint config, README, CLAUDE.md, LICENSE — (enabler) CI green —
P-02 Concept-to-type mapping doc and glossary from the research brief PRD G-1 Mapping covers research §8.4 and §9.8 P-01
P-03 pkg/ref reference grammar PRD-FR-604; TRD-015 Round-trip tests P-01
P-04 pkg/impact core model with a minimal required set, reusing prism-core PRD-FR-101…110; TRD-001, 016 Round-trip, enum, minimal fixture P-02, P-03
P-05 ObservationSet, Status, StatusDiff, ActorRegistry PRD-FR-111, 406; TRD-002 Round-trip tests P-04
P-06 Schema pipeline, embed, schemakit lint, drift check PRD-FR-201, 202; TRD-003, 004 0 lint violations; drift check P-04, P-05

Phase 2 — Load, Validate, and Edit

Step Approach Satisfies Verification Depends on
P-07 pkg/impactio load, limits, merge, canonical Format PRD-FR-203, 704; TRD-005, 031 YAML/JSON equality; fmt idempotence P-06
P-08 pkg/validate PRD-FR-301; TRD-006 Table tests P-07
P-09 pkg/graph PRD-FR-302; TRD-007 Unit, property, benchmark P-08
P-46 pkg/edit patch engine PRD-FR-701, 702, G-14; TRD-029 Rejection and @id tests P-08
P-11 pkg/service + cmd/impact-model: validate, graph, schema, init, fmt, patch PRD US-1, US-16; TRD §6.1 CLI tests P-09, P-46
P-47 Element commands compiled to patches PRD-FR-703, US-16; TRD-030 Equivalence; dangling-reference tests P-46, P-11

Phase 3 — Pathways, Metric Library, Provenance, and Reference Examples

Step Approach Satisfies Verification Depends on
P-32 Pathways and parent / child ToC references PRD-FR-112, US-9; TRD-017 Round-trip; cross-document tests P-08, P-47
P-33 Metric library, glossary, indicator extensions PRD-FR-113, 114, 117, US-10; TRD-017 Roll-up declaration validation P-32
P-52 Provenance on every element, indicator dataAvailability, Consultation type; rejected-element exclusion PRD-FR-124, 125, 123; TRD-036 Round-trip; exclusion tests P-33
P-10 Reference examples (fictional) with provenance: intermediary organization and market adoption PRD G-1, G-9, US-1 Both validate P-33, P-52

Phase 4 — Workshop Pack and Source Drafting

Step Approach Satisfies Verification Depends on
P-22 Versioned report.View, status optional, basis badges PRD-FR-501, 502, 505; TRD-010 View tests P-09, P-10
P-23 Mermaid pathway renderer PRD-FR-501, G-12 Golden Mermaid P-22
P-37 Logic-model, metric-definitions, glossary reports PRD-FR-505, US-12; TRD-022 Golden files P-22
P-49 Marp engine and workshop deck PRD-FR-801, G-15, US-17; TRD-033 Golden deck P-23, P-37
P-39 impact-model report definition kinds, definitions pack, impact-model export csv PRD-FR-204, 505, G-12; TRD-021 CLI and CSV golden tests P-23, P-37, P-11
P-53 impact-model evidence add; impact-draft-from-sources skill PRD-FR-606, US-19, G-17; TRD-037 Skill smoke test over saved fixture pages P-47, P-52, P-39

Phase 5 — Review and Agreement (→ M1)

Step Approach Satisfies Verification Depends on
P-54 assessment report PRD-FR-512, US-19; TRD-038 Golden file P-22, P-52
P-56 pandoc Markdown profile, PNG diagrams, export stamps, impact-model export docx\|pptx PRD-FR-901, 902; TRD-039 Golden Markdown; stamp tests; pandoc test (skipped when absent) P-39, P-49, P-23
P-57 Review packet and review sheet exports PRD-FR-903, US-20; TRD-039 Golden files P-54, P-56
P-58 ReviewResponse schema; impact-model import review (JSON and --from-csv) to proposals plus consultation PRD-FR-904, 905, US-20; TRD-040; INV-10 Seeded-row tests incl. stale hash and quoted-text resolution P-57, P-46
P-55 impact-model approve PRD-FR-707, US-21; TRD-041 Approval and refusal tests P-58, P-52

Phase 6 — Measurement Framework Design (→ M1.5)

Step Approach Satisfies Verification Depends on
P-34 Selection, collection cost, budget, pkg/burden PRD-FR-115, G-10, US-11; TRD-020 Burden tests P-33
P-35 Audiences, theme codebook, Story, LearningReview PRD-FR-116…118; TRD-017, 018 Validation tests P-33
P-44 UNDG change analysis: causes, responsibility, priority criteria, target groups; assumption and risk enrichment PRD-FR-105, 108, 119…122; TRD-025 Reference validation P-32, P-34
P-36 Intermediary example extended; schemas lint-clean PRD G-9 success metric Validates; schemakit 0 P-34, P-35, P-44
P-38 Metric-selection and collection-plan reports and CSV PRD-FR-505, US-11; TRD-022 Golden files P-22, P-34, P-39

Phase 7 — Quality: Lint, Rubric, and Judging

Step Approach Satisfies Verification Depends on
P-12 Lint engine with profiles PRD-FR-303, 304, 804; TRD-008, 035 Registry, profile tests P-09
P-13 Structure and logic rules PRD-FR-303 Fixture per rule P-12
P-14 Remaining rule families (incl. provenance TOC-PRV-*) PRD-FR-303, US-10, US-11 Fixture per rule P-12, P-36
P-15 Template, core rubric, development profile PRD-FR-601; TRD-012, 028 Parse; checklist coverage P-04
P-50 pkg/judge show / record / summary PRD-FR-803, G-16, US-18; TRD-034 Bundle, hash, aggregation tests P-15, P-39
P-16 impact-model lint CLI; discrimination eval with ≥ 2 judges PRD US-2 Eval record P-13, P-14, P-50

Phase 8 — Measurement (→ M2)

Step Approach Satisfies Verification Depends on
P-17 Indicator status incl. baseline_only PRD-FR-401, 402, 509; TRD-009, 019 Branch tests P-08, P-33
P-18 Outcome, pathway, cross-pathway roll-ups PRD-FR-403, 113; TRD-019 Logic and aggregation tests P-09, P-17
P-19 Assumption propagation; confidence PRD-FR-404, 405 US-5 test P-18
P-20 measure.Evaluate, theme counts, Diff PRD-FR-406; INV-3 Golden snapshots P-19, P-35
P-40 CSV observation import PRD-FR-204, US-13; TRD-021 Seeded-bad-row tests P-07, P-33
P-21 impact-model status, impact-model import CLI; benchmarks PRD US-4, US-13; TRD §8 CLI; < 1 s P-20, P-40, P-11

Phase 9 — Reporting, Story, and Presentations (→ M3)

Step Approach Satisfies Verification Depends on
P-24 Status reports PRD-FR-501, US-3 Golden; citations P-20, P-22, P-23
P-41 Audience story report PRD-FR-506, US-14; TRD-023 Golden; absence P-24, P-35
P-42 Learning-review and portfolio reports PRD-FR-507, 508, US-14 Golden P-24, P-34
P-45 Narrative and division-of-labour reports PRD-FR-510, 511, 120; TRD-026, 027 Golden P-22, P-44
P-25 Custom templates; restricted suppression PRD-FR-502, 503; TRD-011 Template; absence P-24
P-51 Exec, learning-review, story decks; export PRD-FR-801, 802, US-17; TRD-033 Golden; export P-49, P-24, P-41, P-42
P-26 impact-model report status kinds; benchmark PRD G-5 CLI; benchmark P-25, P-41, P-42, P-45, P-21

Phase 10 — Agents and Revisions (→ M4)

Step Approach Satisfies Verification Depends on
P-27 MCP server incl. impact_patch, impact_deck, impact_judge_bundle PRD-FR-602, 706, US-6; TRD-013 In-memory transport; traversal P-26, P-46, P-50
P-48 pkg/diff; impact-model diff --revision PRD-FR-705, US-16, US-21; TRD-032 Golden diffs incl. rejected elements P-46, P-09
P-43 Agent skills: author, status refresh, learning review, audience story PRD-FR-605, US-15, G-13; TRD-024 Smoke test twice P-26, P-39, P-47
P-59 toc-share-google skill with manual fallback PRD-FR-607, US-20, G-18; TRD-042 Smoke test with recorded tool outputs P-56, P-57, P-58, RMI-GOGOOGLE-006, RMI-MCPGOOGLE-004, RMI-MCPGOOGLE-005

Phase 11 — Ecosystem Integration and Release

Step Approach Satisfies Verification Depends on
P-28 pkg/prismx exports; import boundary PRD-FR-603, US-7; TRD-014 prism-roadmap validation P-20
P-29 Actor registry, cross-document refs, competing-futures fixture PRD G-8, US-8; TRD §7.3 0 schema changes P-08, P-32
P-30 USM/UFM integration contract PRD G-8 Owner review P-29
P-31 Docs, CHANGELOG, v0.1.0; spec-type sync follow-up All CI green; publication scan clean P-27, P-43, P-48, P-59, P-28, P-30, P-51

4. Sequencing and Dependencies

Phase 1:  P-01 → {P-02, P-03} → P-04 → P-05 → P-06
Phase 2:  P-06 → P-07 → P-08 → {P-09, P-46} → P-11 → P-47
Phase 3:  P-47 → P-32 → P-33 → P-52 → P-10
Phase 4:  P-10 → P-22 → {P-23, P-37} → {P-49, P-39} → P-53          ← M0
Phase 5:  P-52 → P-54;  {P-39, P-49} → P-56;  {P-54, P-56} → P-57 → P-58 → P-55   ← M1
Phase 6:  P-33 → {P-34, P-35} → P-44 → P-36;  P-34 → P-38            ← M1.5
Phase 7:  P-09 → P-12 → {P-13, P-14};  P-04 → P-15 → P-50 → P-16
Phase 8:  P-33 → P-17 → … → P-20 ─┐  P-40 ─┴→ P-21                      ← M2 (with P-24)
Phase 9:  P-20 → P-24 → {P-41, P-42, P-45, P-25} → {P-51, P-26}     ← M3
Phase 10: P-26 → {P-27, P-43};  P-46 → P-48;  {P-56..P-58, gogoogle, mcp-google} → P-59  ← M4
Phase 11: P-20 → P-28;  P-32 → P-29 → P-30;  all → P-31

Critical path to M1 (27 RMIs): P-01 → P-04 → P-06 → P-07 → P-08 → P-46 → P-11 → P-47 → P-32 → P-33 → P-52 → P-10 → P-22 → P-37 → P-49 → P-56 → P-57 → P-58 → P-55.

Cross-repository dependency. P-59 waits on INIT-GOGOOGLE-001 (RMI-GOGOOGLE-006, the CLI) and INIT-MCPGOOGLE-001 (RMI-MCPGOOGLE-004/005, suggestions and comments tools). The M1 review loop does not wait on them: it runs with manual upload, a CSV review sheet, and impact-model import review --from-csv.

Parallel streams:

  • P-15 (rubric) as soon as P-04 is done.
  • Phases 7 and 8 alongside each other.
  • P-40 alongside P-17–P-20.
  • Phase 11 alongside Phases 9–10.
  • The gogoogle and mcp-google initiatives alongside Phases 1–9.

5. Data and Migration

Not applicable for v0.1. Pre-release documents are migrated with impact-model fmt and impact-model validate. The model only gets additive changes after Phase 6.

6. Testing Strategy

As in TRD §12, plus:

  • Provenance: rejected-element exclusion tests.
  • Review import: seeded rows covering every origin (sheet, table, comment, suggestion) and stale hashes.
  • Export stamps: checked for every format.
  • pandoc and mmdc: export tests skipped when the tools are absent.
  • Skills: smoke tests for impact-draft-from-sources (saved fixture pages) and toc-share-google (recorded gogoogle / mcp-google outputs).

Coverage target ≥ 80 % on pkg/....

7. Rollout and Rollback

  • Phase pre-releases. Each phase ends in v0.1.0-alpha.N. Adopter milestones pin the pre-release they used.
  • Final release. Phase 11 ends in v0.1.0.
  • Tagging. Tag only after CI is green.
  • Rollback. Pin the previous tag.
  • Adopter data stays out of this repository. Adopter documents, sources, evidence, observations, stories, review responses, decks, and verdicts live in the adopter's own repository or drive. This repo contains only fictional examples.

8. Risks and Open Questions

ID Risk / Question Likelihood / Impact Mitigation / Owner
PR-1 Model churn after Phase 6 Medium / Medium Thin slice exercises the core early; additive-only after Phase 6. Owner: initiative lead
PR-2 schemakit flags generated shapes Medium / Low Key/value slices. Owner: implementer
PR-3 prism-roadmap API changes Low / Low Adapter isolation. Owner: implementer
PR-4 Rubric does not discriminate, or judges disagree Medium / Medium Eval with ≥ 2 judges. Owner: initiative lead
PR-5 USM/UFM needs surface late Medium / High Contract review and fixture before v0.1.0. Owner: initiative lead
PR-6 Scope creep Medium / Medium Reserved names; connectors upstream. Owner: initiative lead
PR-7 Adopter schedule outpaces the phases Medium / High M0 needs Phases 1–4; M1 adds Phase 5 (27 RMIs in all). Use pre-release tags and the manual review fallback. Owner: initiative lead
PR-8 Adopter data leaks into this public-ready repo Low / High Fictional examples; adopter files elsewhere; publication scan. Owner: initiative lead
PR-9 Non-technical adopters cannot run a CLI High / Medium Skills, edit commands, CSV and review-sheet paths. Owner: initiative lead
PR-10 Patch engine edge cases Medium / High Validation after every patch; property tests. Owner: implementer
PR-11 Marp, Mermaid, or Pandoc CLI changes or absence Medium / Low Markdown is the contract; exports optional. Owner: implementer
PR-12 Public-source drafts read as claims about the organization Medium / High Basis badges in every artifact; assessment report frames inferred items as questions; provenance lint. Owner: initiative lead
PR-13 Reviewers use comments and suggestions that tooling cannot yet read High / Medium Response columns requested in the packet; review sheet; gogoogle and mcp-google initiatives add comment and suggestion reading. Owner: initiative lead
PR-14 Free-text review rows are misinterpreted when turned into patches Medium / Medium Free text becomes flagged notes, not ops; a human applies proposals with impact-model patch. Owner: implementer

No open question blocks Phase 1.