Skip to content

SCALE Roadmap

Roadmap organized by themed phases. Status is derived from member RMI statuses.

Phase 1: Foundation (v0.1.0)

Core specification and tooling for platform maturity measurement.

RMI Status Description
RMI-SCALE-001 Done Core SCALE types (Framework, Domain, Capability, Metric)
RMI-SCALE-002 Done Maturity ladder computation with weakest-link semantics
RMI-SCALE-003 Done Rollup aggregation and period comparison
RMI-SCALE-004 Done External model support (AWS, New Relic)
RMI-SCALE-005 Done HTML story report with aspect tiles and movers
RMI-SCALE-006 Done CLI (validate, report, export)
RMI-SCALE-007 Done Lit web component (<scale-report>)
RMI-SCALE-008 Done Reference catalog (api, observability, security)

Phase 2: Documentation & Integration

Authoring guides and ecosystem integration.

RMI Status Description
RMI-SCALE-010 Done Catalog authoring guide
RMI-SCALE-011 Done Register SCALE as framework constant in prism-core
RMI-SCALE-012 Done Add SCALE aspect types to prism-core
RMI-SCALE-013 Done Add scaleAspect field to prism-maturity SLI type
RMI-SCALE-014 Planned prism-maturity SCALE rollup integration

Phase 3: Distribution

Binary distribution and package publishing.

RMI Status Description
RMI-SCALE-020 Planned GoReleaser configuration for multi-platform binaries
RMI-SCALE-021 Planned Homebrew tap (brew install scale)
RMI-SCALE-022 Planned npm publish @productbuildershq/scale-report

Phase 4: Additional Domains

Expand the reference catalog with more engineering domains.

RMI Status Description
RMI-SCALE-030 Planned Developer Experience (DevEx) domain
RMI-SCALE-031 Planned Data Engineering domain
RMI-SCALE-032 Planned Cost Optimization domain
RMI-SCALE-033 Planned Infrastructure domain
RMI-SCALE-034 Planned AI/ML Engineering domain

Phase 5: Advanced Features

Enhanced reporting and analysis capabilities.

RMI Status Description
RMI-SCALE-040 Planned MkDocs documentation site with Material theme
RMI-SCALE-041 Planned Multi-period trend analysis and sparklines
RMI-SCALE-042 Planned PDF export for executive reports
RMI-SCALE-043 Planned Slack/Teams integration for report distribution
RMI-SCALE-044 Planned Assessment automation via CI pipeline

Phase 6: Fleet Reporting

Enterprise-scale multi-team reporting.

RMI Status Description
RMI-SCALE-050 Planned Multi-team aggregation (org-level rollups)
RMI-SCALE-051 Planned Team comparison views
RMI-SCALE-052 Planned Portfolio dashboard generation
RMI-SCALE-053 Planned Time-series metrics export for BI tools

Completed

  • v0.1.0 (2026-07-25): Phase 1 complete
  • v0.1.1 (2026-07-25): Phase 2 RMI-010 through RMI-013 complete