Authoring an Outcome Model¶
An outcome model is one document of connected elements. This guide describes the elements, how they refer to each other, and the ways to change them.
The elements¶
| Element | What it is |
|---|---|
| Outcome | A change that should happen, at one of five levels: output, short_term, medium_term, long_term, or impact |
| Link | A causal arrow from one outcome to another, with a rationale and a polarity. A feedback link marks a loop |
| Group | Preconditions for an outcome: all of them, any of them, or at least k of n. Groups can nest |
| Intervention | Something the program does to bring about outcomes, with the resources it uses and, optionally, when it runs (startDate, endDate) |
| Assumption | Something that must hold for a link or outcome to work, with a criticality and a status |
| Indicator | How an outcome, activity, or assumption is measured, with a baseline, targets, and a frequency. It can also be worked out from other indicators, such as a cost per outcome |
| Actor | A person or organization who changes, delivers, or co-owns an outcome |
| Evidence | A source that supports or contradicts an element, with a sensitivity |
| Pathway | A named route through the outcome model, such as one program's or product's contribution, with the North Star it steers by and the resources it commits |
| Cause, effect, target group | The problem tree: causes below the core problem (context.problemStatement), effects above it, each linked to others through parents, and the groups affected. Outcomes say which causes they address and which effects they relieve. A pathway can have its own tree: its problemStatement, and the causes and effects that name it in pathwayIds. See the problem tree guide |
| Audience, theme | Who needs to see what reported, how often, the short list of numbers each is told, and the codebook for coding stories |
| Evaluation, learning question, review meeting | The evaluation plan, the learning agenda, and when the team stops to review what it has learned. See Evaluation and learning |
| Metric, term | A shared metric library, and a glossary of the words the outcome model uses |
| Risk, decision, factor, consultation | What could go wrong, what is awaiting a decision, external factors, and the review trail |
An outcome also records its responsibility: own, shared, partner, or
unaddressed, so a report can separate what the organization answers for from
what it only monitors. The document names a ceiling of accountability,
the level above which outcomes are tracked but not claimed.
Every ID is a lowercase kebab-case slug, unique across the document, and references are by ID.
What a program steers by, and what each audience is told¶
These choices sit on top of the chain from activities to impact. They are different things, and an outcome model can make all of them.
- Projections on a pathway mark what else it is meant for.
projections: [dmaic]marks a program measured often enough to improve with DMAIC; lint then checks its indicators' cadence and survey sizes. See the DMAIC guide. - A North Star is the one number a program or product steers by. It is set on the pathway, with a dated one metric that matters for each period and the guardrails that watch what chasing it could harm. It should measure an outcome at or below the ceiling of accountability, never an output or an activity.
- A headline list is what an audience is told: a short, ordered list on the audience, each entry an indicator with an optional label and note worded for that reader. The board, funders, and members can each lead with different numbers drawn from the same indicators, and every audience sees the same figure for an indicator.
- Resources and timing say where effort goes. A pathway's
resourceslist what it commits as a whole, each with a name and an allocation such as "2 squads" or "15% of the budget". An intervention'sresourcessay what that one piece of work uses, and itsstartDateandendDatesay when it runs; ongoing work has a start and no end. Lint warns when the dates fall outside the time horizon (OM-INT-008). - Purpose is
context.mission,context.vision, andcontext.values: why the organization exists, what it works toward, and the principles that guide how it works, most important first. They are not part of the causal chain. A V2MOM needs the vision and at least one value; a VSEM needs the vision or the mission. - The objective is
context.objective: the one thing the model sets out to achieve, as a statement and the outcomes that say it has been reached. A model with a single impact outcome has that outcome as its objective; one with several should name the objective, which plans with one objective, such as an OGSM, need (OM-CTX-002; see the OGSM guide). - Scorecard perspectives place outcomes in a Balanced Scorecard:
scorecardPerspectiveismission,financial,customer,internal_process, orlearning_growth, andownerActorIdnames who answers for the outcome. An indicator'sleadLagsays whether it moves before the results (lead) or reports one (lag). The causal links between the placed outcomes become the strategy map; lint checks that it runs upward and that each objective is owned and measured (OM-BSC-001 to 004; see the Balanced Scorecard guide).
# A pathway's North Star, and what watches it
outcome-model pathway set outcome-model.yaml pw-learning \
--north-star ind-practice-maturity --guardrails ind-retention-learning
# What the board is told, in order
outcome-model audience set outcome-model.yaml aud-board --set 'headline=[
{"indicatorId":"ind-practice-maturity","label":"Leadership practice across members"},
{"indicatorId":"ind-reach-network"}]'
# What a pathway commits, and when an intervention runs
outcome-model pathway set outcome-model.yaml pw-learning \
--set 'resources=[{"name":"Program staff","allocation":"3 staff"}]'
outcome-model intervention set outcome-model.yaml int-training-series \
--start-date 2026-09-01 --end-date 2027-05-31
# The one thing the model sets out to achieve
outcome-model patch outcome-model.yaml - <<'EOF'
[{"op":"add","path":"/context/objective","value":{
"statement":"Member nonprofits are strong and connected enough that residents are served and heard",
"outcomeIds":["oc-resident-access","oc-resident-voice"]}}]
EOF
# Why the organization exists
outcome-model patch outcome-model.yaml - <<'EOF'
[{"op":"add","path":"/context/mission","value":"Strengthen local nonprofits."}]
EOF
# An outcome as a scorecard objective, and a lead measure of it
outcome-model outcome set outcome-model.yaml oc-im-lower-overhead \
--scorecard-perspective customer --owner act-network
outcome-model indicator set outcome-model.yaml ind-overhead-share --lead-lag lead
Some of the numbers people ask for are arithmetic on others, such as the cost
per applied change. Give that indicator a composedOf, and its value is worked
out from the latest value of each part when it has none of its own:
outcome-model indicator set outcome-model.yaml ind-cost-per-change \
--composed-op ratio --composed-of ind-cost,ind-changes-applied
A ratio and a difference take exactly two indicators, in order. A composition is arithmetic and not a causal link. See Measuring progress for how the value is worked out and what is withheld, and Quality and judging for the rules that check all of it.
Evaluation and learning¶
Indicators say how progress is monitored. Three more elements say when the team will ask whether and why results happened, and what it most needs to find out:
- Evaluations are the evaluation plan: each with its questions, a type
(
baseline,process,formative,midterm,final,impact, ordevelopmental), a method, who carries it out (internal,external, ormixed), and dates. What an evaluation finds is recorded as evidence of typeevaluation. - Learning questions are the learning agenda: each with the decision it
informs, how and by when it will be answered, and the outcomes, links,
assumptions, interventions, or indicators it tests. Mark one
answeredwith its answer once it is. - Review meetings say when the team stops to review: how often, who takes part, and which learning questions each takes up. Each meeting held is recorded as a learning review in that period's observation set.
An indicator's qualityAssurance says how its data is checked, and an
audience's frequency how often it is reported to. Together they make the
model a complete monitoring, evaluation, and learning plan, which export mel
writes out (see the MEL guide). Once the model has
evaluations or learning questions, lint asks that every high or critical
assumption not yet shown to hold is taken up by one (OM-LRN-001), that open
questions are reviewed (OM-LRN-002), and that dates fall within the time
horizon (OM-LRN-003).
outcome-model question add outcome-model.yaml --id lq-skills-applied \
--question "Do leaders who finish a cohort change how they run their organizations?" \
--rationale "Decides whether to keep investing in cohorts" \
--methods "Rubric ratings at six months" --due 2027-03-31 \
--related asm-skills-applied,ln-skills-practice
outcome-model evaluation add outcome-model.yaml --id eval-midterm --title "Midterm review" \
--type midterm --evaluator external --start-date 2027-04-01 --end-date 2027-06-30 \
--questions "Are member leaders applying what they learn?" --related asm-skills-applied
outcome-model review-meeting add outcome-model.yaml --id mtg-quarterly \
--name "Quarterly learning review" --frequency P3M --questions lq-skills-applied
outcome-model audience set outcome-model.yaml aud-board --frequency P3M --owner act-network
Provenance: stated, inferred, or confirmed¶
Each element carries a basis that says why it is in the outcome model:
| Basis | Meaning |
|---|---|
stated |
A source says it. Cite the evidence |
inferred |
Our reading of the sources |
hypothesis |
A guess to test; the first thing to challenge in review |
confirmed |
The people it concerns agreed |
rejected |
Considered and set aside; kept on record, left out of diagrams and analysis |
Record who decided a confirmed or rejected basis with --decided-by as a
group or role, not a personal name, and when with --decided-at.
Change an outcome model with commands¶
Every element kind has add, set, and rm:
outcome-model outcome add outcome-model.yaml --id oc-skills --title "Staff write strong applications" --level short_term
outcome-model link add outcome-model.yaml --id ln-skills-adoption --from oc-skills --to oc-adoption --rationale "Skilled staff apply more often"
outcome-model outcome set outcome-model.yaml oc-skills --basis confirmed --decided-by "Program board" --decided-at 2026-04-01
outcome-model outcome rm outcome-model.yaml oc-skills --cascade
Run outcome-model <element> add --help to see every field as a flag.
Each command is compiled to a JSON Patch and applied through the same validated path, which has these guarantees:
- Atomic. If any step fails, nothing is written.
- Never worse. A change is rejected if the result would have more structural
errors than before.
--allow-errorsaccepts structural errors but never a schema violation. - Canonical. The file is rewritten in canonical form in its own format.
- Previewable.
--dry-runprints the resulting document and writes nothing. - Honest removal. Removing an element that others refer to is rejected;
rm --cascaderemoves the references as well and tells you what it removed.
Change an outcome model with a patch¶
For many changes at once, or from a script or an agent, apply an RFC 6902 JSON Patch:
echo '[{"op":"replace","path":"/outcomes/@oc-skills/title","value":"Staff write strong applications"}]' \
| outcome-model patch outcome-model.yaml -
Pointers can address an array element by ID: /outcomes/@oc-skills/title
selects the outcome with ID oc-skills, and /outcomes/- appends. The patch is
applied to a copy, and all of the guarantees above apply.
Keep a revision log¶
When an outcome model changes after review, record why. outcome-model diff compares
two versions by element ID, so a retitled outcome is one changed element, and
the same outcome model in YAML and JSON has no differences:
outcome-model diff outcome-model-v1.yaml outcome-model-v2.yaml
outcome-model diff outcome-model-v1.yaml outcome-model-v2.yaml --revision --version 0.2 --date 2026-03-01 \
> revision.patch.json
outcome-model patch outcome-model-v2.yaml revision.patch.json
--revision prints a patch that appends a draft revision listing every changed
element ID. Review it, then apply it.
Outcome models that belong together¶
- Parent and child. A program's outcome model can contribute to an organization's.
validate program.yaml --parent organization.yamlchecks that thecontributesToreferences resolve in the parent. - Competing futures. Outcome models describing different futures of one market
share one actor registry.
validate a.yaml b.yaml c.yaml --registry actors.yaml --futureschecks that they name their futures and perspectives, do not both speak for the same actor in the same future, and refer to each other's elements correctly. See thecompeting-futuresexample.
Schemas for editors and agents¶
The JSON Schemas are generated from the Go types and embedded in the binary:
Seven schemas are available: theory-of-change, observation-set,
outcome-model-status, status-diff, actor-registry, review-response,
and csv-mapping.