An outcome model says what you expect. Measuring says how far you have come. The measurement is a pure function of three inputs: the outcome model, the observations, and a date. The same inputs always give the same answer.
Indicators¶
An indicator says how an outcome (or an assumption) is measured. It carries a
baseline, targets with dates, a collection frequency, and the direction that
counts as progress (increase or decrease). A quantitative indicator has
numbers; a qualitative one has ordered levels, such as Emerging to Embedded.
Indicators can use a shared metric from the library, so the same measure is
defined once. A metric says how values combine across pathways: sum, mean,
weighted_mean, median, mode, min, max, latest, or none for a count
that cannot be added up, such as distinct people. An indicator can also roll
up from other indicators; a direct observation always beats a roll-up.
An indicator's claim says what the organization can say about it:
attribution (we caused this) or contribution (we contributed to it). The
default is contribution.
Where an indicator sits in the chain¶
What an indicator measures decides its tier, which is never stored:
| Tier | The indicator measures | For example |
|---|---|---|
activity |
an intervention | hours delivered, dollars spent |
output |
an output-level outcome | people reached |
outcome |
a short-term, medium-term, or long-term outcome | skills gained, practice applied. These are the driver metrics |
impact |
an impact outcome | residents served, reported as a contribution |
Resources are measured as activity-tier indicators with a unit such as hours or
dollars. outcome-model report metric-tree lays a pathway's indicators out in
this order.
Roles: North Star, one metric that matters, and guardrails¶
A tier says where an indicator sits. A role says what a team uses it for. Roles
are set on the pathway, in its focus, and point at indicators the pathway already
has, so one indicator can hold several roles:
pathways:
- id: pw-onboarding
focus:
northStarId: ind-retention-90 # the lasting value delivered
oneMetrics: # where the team focused, period by period
- indicatorId: ind-signups
from: 2026-07-01
to: 2026-12-31
stage: acquisition
reason: Too few accounts to learn from.
- indicatorId: ind-first-week-recon
from: 2027-01-01 # no end: the current focus
stage: activation
reason: Most new accounts never reconcile a month.
guardrailIds: [ind-support-load] # watched so the North Star does no harm
rationale: Steer by retention; protect support.
| Role | What it is | Changes | Checked by |
|---|---|---|---|
| North Star | The one number that best captures the value a program or product delivers to the people it serves | Rarely | OM-NSM-001 to 007: it measures an outcome at or below the ceiling of accountability, has a baseline and a target, has a guardrail, and serves its own pathway |
| One metric that matters | The number the team focuses on at its current stage, from Lean Analytics (Croll and Yoskovitz). Often a driver further down the chain, such as activation, or a measure of the riskiest assumption | With the stage, often each quarter, so it is dated: each entry has a from, an optional to, a stage, and a reason |
Validation: each entry has a start date, ends no earlier than it starts, and no two periods overlap. OM-NSM-008: each serves its own pathway. OM-NSM-009: each that measures an outcome or an intervention other than the North Star's leads to the North Star through the causal links |
| Guardrail | A number watched so that pursuing the North Star does not harm something else, such as equity, quality, or staff burden | Rarely | OM-NSM-004 and 006: a North Star has one, and it is not the North Star itself |
The roles are not further steps after impact. The North Star sits at or below the ceiling of accountability: it is the highest change the team answers for. Impact, above the ceiling, is tracked and reported as a contribution. Early on, the North Star and the one metric that matters are often the same indicator.
The one metric that matters on a date is the entry whose period covers it. Reports with a snapshot use the snapshot's date; without one, the entry that started last is the current focus. Earlier entries stay on record, so a review can see what the team steered by in each period. To change the focus, give the new one and the day it starts; the current focus ends the day before:
outcome-model pathway focus outcome-model.yaml pw-onboarding \
--one-metric ind-first-week-recon --from 2027-01-01 \
--stage activation --reason "Most new accounts never reconcile a month"
outcome-model report metric-tree marks each role among the tiers, and lists the
other periods' one metric that matters. The executive
report and deck (report exec, deck exec) open with what each program steers by:
its North Star and its one metric that matters, with their status, and any guardrail
that is off track, at risk, stale, or without data. The V2MOM, VSEM, and OGSM exports
use the roles as each strategy's measures.
Headline lists and purpose¶
Two more choices are different again:
- A headline list is what an audience is told: a short, ordered list on the
audience, each entry an indicator with an optional
labelandnoteworded for that reader. Every audience sees the same figure for an indicator; only the label and note differ. A North Star is what a team steers by; it may lead one list and not appear in another. - Purpose is
context.missionandcontext.vision, plain statements. They are not part of the causal chain.
outcome-model report headline shows what each audience is told, and the story
report and deck use the same lists. outcome-model lint checks them with the
OM-HLN-*, OM-AUD-002, and OM-CTX-001 rules.
Working a metric out from others¶
Some of the numbers people ask for are arithmetic on others, such as the cost per
applied change. Give that indicator a composedOf:
composedOf:
op: ratio # ratio, difference, product, or sum
indicatorIds: [ind-cost, ind-changes-applied] # cost divided by changes
A ratio and a difference take exactly two indicators, in order. When the indicator has no observation of its own, its value is worked out from the latest value of each part, and it is marked as an estimate if any part is. If a part is missing, or a divisor is zero, there is no value and nothing is guessed. A composition is arithmetic, not a causal link, and an indicator is either composed or rolled up, not both.
Observations¶
Measurements go in an observation set, a separate file that refers to the Outcome model by ID:
kind: ObservationSet
specVersion: "0.1"
modelId: riverbend-network
period: 2026-Q3
observations:
- indicatorId: ind-hours-learning
date: "2026-09-30"
value: 3650
source: Attendance sheets
quality: verified
An observation has a date and either a value (quantitative) or a level
(qualitative), plus a source, a quality (verified, reported, or estimated), and an
optional note. The same file also holds:
- Assumption assessments: whether an assumption is still holding.
- Stories: a person's account, with the consent that was given and a sensitivity. See consent.
- Learning reviews: what changed in a period, the surprises, and decisions.
- Notes: context that belongs with the numbers.
Check a set against the outcome model it measures:
Load a spreadsheet¶
Most programs already keep their numbers in a spreadsheet. Describe its columns once in a mapping file, then import:
modelId: riverbend-network
period: 2026-Q4
dateFormat: 02/01/2006
columns:
indicator: Measure
date: Month end
value: Value
pathway: Program
quality: Quality
source: Source
indicatorAliases:
Leadership practice maturity: ind-practice-maturity
metricAliases:
Attendee hours: met-attendee-hours
outcome-model import observations --csv q4.csv --map mapping.yaml --model outcome-model.yaml \
--out obs-q4.yaml --unmatched q4-unmatched.csv
A row can name an indicator directly, through an alias, or through a metric plus
a pathway. Every row either becomes an observation or is reported as unmatched
with its row number and the reason; nothing is dropped silently. Unmatched rows
are written to --unmatched as a sheet you can fix and import again. The exit
code is 1 when some rows were unmatched (the rest are still written).
Status¶
outcome-model status outcome-model.yaml -O obs-q3.yaml -O obs-q4.yaml --as-of 2026-12-31 --out status-q4.json
status prints a summary. --format json prints the full snapshot, and --out
writes it to a file. The date defaults to the latest observation.
Indicator status¶
For each indicator the snapshot gives its progress against what the targets call for by the date:
| Status | Meaning |
|---|---|
achieved |
The latest value has reached the target |
on_track |
At or within tolerance of the expected progress |
at_risk |
Behind expected progress by more than the tolerance |
off_track |
Far behind, or moving the wrong way |
stale |
The newest observation is older than twice the collection frequency |
no_data |
Nothing observed, and the first target date has passed |
not_started |
Nothing yet, before the first target date |
baseline_only |
No targets to measure against |
--tolerance (default 0.10) sets how far behind still counts as on track.
Outcome and pathway status¶
An outcome's status combines its indicators (--rollup worst, the default, or
mean) with the state of what leads to it. Pathway status follows the
precondition logic: an all group takes its worst member, any its best, and
at_least k the k-th best. A negative link, an inhibitor, caps its target at
at_risk while its source is on track.
Assumptions and confidence¶
An assumption assessed as at risk caps every link and outcome that depends on
it at at_risk; a critical assumption that is invalidated caps them at
off_track. Each link gets a rule-based confidence score from its evidence,
its assumptions, and whether it has a rationale. Confidence for a route to
impact is derived from its links, so a weak link shows up where it matters.
What changed¶
Keep each snapshot and compare:
outcome-model status outcome-model.yaml -O obs-q4.yaml --prev status-q3.json
outcome-model report exec outcome-model.yaml -O obs-q4.yaml --prev status-q3.json
The comparison lists the indicators, outcomes, links, and assumptions whose status or confidence changed, and the elements that were added or removed.